Load-Rejection
background

Load rejection from 90% stroke. Unit acceleration time is 6 and 4 sec. It is possible to disconnect the units separately or disconnect the station power line. During dynamic operation Alab will check levels and pressures in all power plant elements and display warnings if e.g. overflow or negative local pressure is detected.